Luoping zinc smelter
The Luoping zinc smelter was built in 1995 with a capacity of 12kt/a slab zinc and has expanded over the years to the current 120kt/a capacity. How...
Baiyin North West zinc smelter
Construction of the Baiyin North West Zinc Smelter (BNWZS) commenced in the late 1980s and it was commissioned in 1992. The BNWZS had a nominal cap...
South Flank iron ore mine
BHP's South Flank mine started production in May 2021. The mine was completed on budget with a total capital intensity of US$45 per tonne. The Sout...
Torreon zinc smelter
The zinc smelter was commissioned in 1973 with a capacity of 100kt/a, the original earlier site operation comprising a lead-silver smelting plant o...
Baiyin (ISF) smelter
The original capacity of the No3 Smelter was 35kt/a zinc. In 2001 a major smelter renovation plan was instigated with the intention of raising the ...
Cajamarquilla (Electrolytic) zinc smelter
The Cajamarquilla smelter in Peru uses roast, leach, electrowin technology to produce slab zinc. Leach residue is treated by the Goethite process. ...