Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
La Caridad copper refinery
Mexicana de Cobre started construction in late 1995 of a 180kt/a cathode refinery adjacent to the existing smelter, where capacity was being increa...
La Caridad copper smelter
Construction of the smelter commenced on a greenfield site in July 1979. Lack of finance resulted in frequent interruptions to construction and gen...
La Oroya (closed) copper smelter
The La Oroya copper smelter was commissioned in 1922 to treat ores and concentrates from surrounding mines. The copper smelter forms part of a meta...
Jinchuan Guangxi copper refinery
The 400kt/a refinery was commissioned in 2013. The first batch of copper cathode was produced in January 2014. Wood Mackenzie’s asset reports are b...
Altonorte copper smelter
The smelter is located near Antofagasta and it uses the Noranda reactor technology. The smelter capacity is 1.2Mt/a conc (349kt/a copper) and its s...
Amarillo (closed) copper refinery
The refinery is located 5 miles north-east of Amarillo, Texas and has excellent road and rail links from smelters and to customers. The plant was b...
Viewing page 24 of 423