Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Jinchuan Guangxi copper refinery
The 400kt/a refinery was commissioned in 2013. The first batch of copper cathode was produced in January 2014. Wood Mackenzie’s asset reports are b...
Glogow I copper refinery
The Glogow I refinery was commissioned as a state enterprise in 1971 to treat anodes from the Glogow I smelter commissioned at the same time, and w...
Glogow II copper refinery
The Glogow II refinery was commissioned as a state enterprise in 1978 with a capacity of 180kt/a cathode to treat anodes from the Glogow II smelter...
Gresik copper refinery
PT smelting has constructed an integrated smelter and refinery complex at Gresik near Surabaya, East Java. 357kg Hazelett cast anodes from the Mits...
Gresik copper smelter
The smelter is located in Indonesia and has a capacity of 1160 kt/a of concentrate. The smelting technology is based in the Mitsubishi process and ...
Kidd Creek (closed) copper refinery
The refinery is located at Timmins, Ontario and has good road and rail links. The plant was commissioned in 1981 together with the on-site smelter....
Viewing page 19 of 423