Frostpipe
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Decommissioning
- Capital Costs
- Operating Costs
Tables and charts
This report includes the following images and tables:
-
Liquids throughput profileCapital Costs Pre-2007 to 2013 (NKr million)Capital Costs Pre-2007 to 2013 (NKr million)
What's included
This report contains:
Other reports you may be interested in
NZM Test - Frostpipe pipeline
Frostpipe ceased to transport hydrocarbons in March 2001, after the Frøy and Lille Frigg fields ceased production in 2001 and 1999
$2,150Frostpipe pipeline LW Test
The Frostpipe was constructed to transport condensate and oil from the Lille Frigg and Frøy fields to the Oseberg field.
$2,150Forcados Oil Pipeline System
The Forcados Oil Pipeline System is one of the largest networks in the Niger Delta. It transports oil, water and associated gas from ...
$2,150