Q4 2024 pre-FID project tracker: Shell wraps up year with Bonga North FID
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Final investment decisions in 2024
- What to look for in 2025?
- About the tracker
Tables and charts
This report includes the following images and tables:
-
Major project FIDs in 2024
What's included
This report contains:
Other reports you may be interested in
North Sea upstream electrification tracker: Q4 2024
Over 40 active and future electrification projects are tracked across Norway, the United Kingdom and the Netherlands.
$1,350Sole
The Sole gas field is located 45 kilometres from the Victorian coast. The field was discovered by Shell in 1973 and came onstream in 2020.
$3,100Wolfsberg - Lithium mine project
A detailed analysis of the Wolfsberg lithium mineral project.
$2,250