Asset Report

Al-Zour LNG - LNG regas terminal

Get this report*

$1,200

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
Due to scheduled maintenance, it will not be possible to complete a purchase between 02:00 and 03:00 UTC on Sunday 17th May.

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Plans to import on a longer-term basis were disclosed as soon as 2010, as Kuwait started to import LNG via its FSRU. The scope and size of the onshore project have evolved over the years. KNPC awarded the pre-FEED and FEED (Front End Engineering and Design) study to a subsidiary of Foster Wheeler and a local partner in March 2014. The terminal is located at Al-Zour, 90 kilometres south of Kuwait City. More than ten ...

Table of contents

  • No table of contents specified

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    al-zour_lng_-_lng_regas_terminal.xls

    XLS 78.66 KB

  • Document

    al-zour_lng_-_lng_regas_terminal_2.xls

    XLS 36.92 KB

  • Document

    Al-Zour LNG - LNG regas terminal

    PDF 1.58 MB